Project Overflow

Sidebar_participants_230px Sidebars_themes
Thm_clrd_28 Thm_clrd_32 Thm_clrd_30
School_172px
Sidebars_aboutproj
Jack Cassaro and his mentor Mike Kleinschmidt worked together as a part of AIGA Jacksonville's Discover Design program.
Sidebars_moreinfo Sidebars_links
+ Share(close)
Email (close)
 
Sidebars_last_modified
December 18, 2011
  • Trans
Jack1
The Project Overflow logo.
Jack2
Safety, health hazards, a negative image, and discomfort are several important reasons why Bishop Kenny should address flooding at school!
Jack3
3,000 gallons of water fall on Bishop Kenny's roof every year. A lack of proper drainage for that water causes the water to land (and stay standing) in student walkways.
Jack4
Specific problem areas at Bishop Kenny High School.
Jack5
Jack and Mike making a presentation at our first session!
Sidebars_challenge

A student's observation of an ongoing natural disaster at Bishop Kenny High School — flooding! This problem affects the safety of faculty and students as standing water creates health hazards. Standing water presents a negative image of the school and causes students to walk around with wet shoes. Eww!

 
Sidebars_solution

Jack's presentation identifies problem areas on the school grounds and makes the case for why this issue should be addressed immediately.